For a lot of us volunteers who had stayed with our girl here in this dusty grimy dirty serious shipyard since as early as last September, the idea of Spirit of South Carolina being returned to the water, began to take on an abstract feel.
But the sight one morning, of both her masts suddenly upright, in their steps, standing rigging lashed all the way down, triggered a number of emotions.. the first, most basic was just plain annoyance... that's right, annoyance.. See, the day before I'd made a special purchase of a Ronson 1/2" turning block, for the Courtesy flag halyard, to be screwed in with a flag halyard lead, into bottom of the starboard mainmast spreader, while the mast was still on the blocks.. Now it was too late.
Other emotions were basically levels of uncertainty, the more I took in. None of the head rig , nor halyard blocks on either mast had been mounted. Only standing rigging had been set up, with brand new steel shrouds, but not rattled down. In Steve, our rigger's defense, he likely had searched, and couldn't find them. We were finding ourselves, as early as months ago.. woefully short staffed on site, being a 40 mile drive from Mount Pleasant. He was in fact last man standing of our 3-man contractor team, Josh and his mate having driven out two days previously. All the hull work had been completed, and repainted except for the large square surfaces currently populated by the huge braces holding her up. That last task would be executed when the gi-mongus Travel Lift arrived to lift and shift the hull off the blocks. We volunteers who answered the call and drove the 40 miles, would jump into full body harnesses and maneuver the scissors lift up under the hull with tubs of red bottom paint, and rollers. That would be the last step, and task in shipyard.
Early the next morning, on May 12, I arrived early, after the normal commute, and was met at the schooner by Rachel Berquist, the Low Country Maritime School's Shipwright in residence. She had beat everyone down here with one driven purpose. To admonish everyone who would listen, to not rush thru the next 18-36 hours, in order to get Spirit back home. She drove hard the stark picture. The schooner had set in dry dock out of the water for nearly nine months, during a drought, with historic lows in humidity. All that pointed to a hull with dried up shrunken planks. On gently, slowly lowering her into the water, we could expect lots and lots of water rising in the bilges. We should expect to have her suspended in that lift at least 24 hours or more, while continuously monitoring bilge pump operations, logging their periods, and fuel consumption.
Arriving just after me was Capt Heath Hackett. Readers of this blog may fondly remember his mentioning in past passages. I regard Capt Hackett as a convert. The owner-operator of a Yacht Management Company ranging all over the east coast, Heath was directed by his client, the schooner's owner at the time, to take charge of Spirit of South Carolina in the role of Delivery Captain and Project Manager, to get her thru her biannual Shipyard. That was 2022.
Now Capt Heath is a Motor Yacht Capt, and systems expert, who didn't know between a bowsprit and a boom lift. He saw a Pirate ship, But after three months in shipyard, and a delivery home in which he hauled his share of halyard, he was a changed mariner. And now, of his own accord, he readily accepted the delivery, to get Spirit of South Carolina back home.
He was,, understandably skeptical of Rachel's warnings, but wisely coordinated with the shipyard Lift operator, the procedure of slowwwly lowering her into the water. by 3PM the hull was settling in the water, the boot strip still 3 feet above the water. Taking his station where he had eyes on the keelson midships,, he was suddenly to exclaim,, "Whoa! there's a LOT OF WATER down here!
As the only volunteer present, with nothing else requiring my time. I volunteered to stay aboard the next 24-36 hours. For that time she stayed suspended in the Lift but boot stripe wetted. Dock lines ran in both port and starboard directions, she floated, maybe, in the center. I had no way off. Monitoring the period between bilge alarms, logging pump operation times and durations, throughout the night. And gradually, the pumps kicked on less often, and they ran shorter durations. By 0715 on the 15th, three days later, there was no measurable gain in total bilge accumulation. And I drove home.