Wednesday, April 29, 2026

Volunteers Use up April Weekends(and a few Weekdays) to take on essential Shipyard Projects.

 March 28th.  The day after the Masts came down.  Big Plans. and the largest gathering of Volunteers since the start of this Shipyard period. Now there was something concrete to do, mainly maintain the masts.  

Once the Coast Guard released the masts from their inspection, Volunteers were almost rubbing their hands with glee. We expected to be an extended week or so of just sanding down to wood, the entire 76 feet of those giant spars. (The white masthead, and table on the opposite end would be sanded/scuffed and given two new coats of gloss white.)  That was not to be the case. 

Media Expert and Volunteer Rebecca Poynten-Murray
 works a rag wet with Borax solution
 over remaining grimy spots on the foremast.
Rigger Steve Geering listened patiently to our plan, then proposed an alternative: "Borax".. the same thing a few of us older generations remembered in commercials of the classic western TV series, "Death Valley Days."  We didn't know that stuff was still around, Obviously new products had to have long ago replaced it's supposedly effectiveness.  Just a big scoop of the white crystal granular powder in a sea bucket of relatively clean water and a super-heavy duty Scotch scrubby, enabled a few volunteers to basically wipe down the entire mast, rinse off their scrubbies and the mast, and let her dry out for rest of the day. By end of the first week in ApriI. In one weekend, Both masts were cleaned of their solid black grime, and stood ready to receive their next coats of ... something.  

As that activity was starting up, Rigger Steve Geering had stripped all the remaining standing rigging, and running rigging gear from the masts.  Shrouds were laid out along side, and ratlines/ratboards separated. Where possible, blocks were unrove and separated out to be serviced, lubricated and repainted. 

Another innovation, was laid out.  In the previous two weeks, a discussion had ensued with Bryan Oliver voicing the history up to this point,, the simple wiping on of two coats of linseed oil for its dual qualities of preservative penetration, and UV protection. followed by gobs of Vaseline for lubrication under the mast hoops. Problem was, it required reapplication annually, and the surface accumulated sufficient dust and grime to form the ugly black patina all over the wood. 

Again, Rigger, Steve Geering posited an alternative; the application of a wood oil, without the stickyness of Boiled Linseed oil, and twice the service life. Conveniently a similar discussion had earlier been resolved regarding the coatings of the brightwork on deck- the railings, hatches, and sapele mahogany trim. 

This year we were implementing a favorite of Board Member, Hank Hofford. Brazil Nut Oil. Unfortunately, three people, Bryan Oliver, and Adam Reed were internet search, having no luck, and time was running out. A substitute, "Penofin" was recommended by someone, some quick research was done, it was available, and so 5 gallons was ordered. 

Rot discovered in the Mainmast head.
 Thanks to Rigger Steve, and Shipwright Ray,
 this section was cut out, and a new section "scarfed back in. 

As it was being applied. Sam Gervais announced the finding and ordering of copious quantities of Brazil Nut Oil 5 gallons. It arrived shortly afterwards, and on recommendation by Steve the Rigger, volunteer, Doug Hartley, Tony Marchesani, and Nick Swarts went to work with paint rollers, applying first one, then two more coats over both masts. Over two weeks, allowing for  the product to penetrate the wood between coats

Piles of blocks down-rigged from the masts
  awaiting some loving care.
Volunteers weren't only maintaining masts. Equally important was all the running rigging gear down rigged, and now, after ten years finally available for close inspection and servicing. Ken Fonville organized a small group of volunteers to transport over a two week period, 24 blocks to the Low Country Maritime Center, where they disassembled each into major components, the sheave, sheave pin, block itself, and sometimes 'strop." Each block was inspected for wear. Sheaves and pins were lubed with grease, and the blocks received a new coat of 'Sandtone' paint.



Another 24 blocks were still up-rigged,
and  unavailable for maintenance.
They will be maintained in place,
 or down-rigged separately.



Shipwright Rachel Berquist of the  Lowcountry Maritime School
 supervises the setting up of the ship's rudder,
which will become her project of "healing."




 

Tuesday, April 7, 2026

Masts are unstepped, Allowing a New Discovery of an Ancient Tradition.


The Foremast is now clear  and horizontal, 
being aligned onto its cradle. 
Around Midmorning, Wednesday, March 25,  Rigger, Stephen began
securing the last remnants of rigging still secured to the masts shrouds, halyard blocks, boom lifts, all tightly lashed at the bottom of the mast  to stabilize their tendency to swing their weight in unpredictable ways, endangering the crane operator or anyone else nearby. 
Three days later, the crane appeared on site to begin the rigging up the fore mast for lifting it out of her step in the forecastle.  In the span of four hours, both masts had been unstepped and lowered to rest on huge wood blocks, next to the schooner.  

Foremast standing rigging
showing much sun damage
 and wear.
Meanwhile, Saturday the 28th, a group of volunteers gathered around the masts, all set with sanders,  to  start work on removing the three years of UV damage and grime covering the 76 foot sections, between the white mast top and the table.  A close look at all the rigging remaining attached at the foremast top, and her length depicts the weather damage done.  The huge Yoke-looking cable is the forestay, with headsail halyard blocks still attached.. The remaining Shrouds under the forestay demonstrate how all rigging was doubled around the mast and seized together at the bolsters.   All standing rigging is being inspected, then where worn off, will be wormed, parceled and served, then painted over with a preservative. 
Bryan Oliver, Dave Brennan, Walter Barton, Ben Walker and shipmates Anna Dailey and  Robert Hitzig, Ken Fonville, and Sam Sablotsky, had all gathered around the masts to get their directions from Bryan, when Steve the Rigger appeared announcing that the Coast Guard had, earlier yesterday, directed that no one could be allowed to touch these masts until they completed their inspection, which would be the following Monday.
Bryan frowned for a moment, wondering what he would now do with all these volunteers, and made the quick decision for all to muster, u on deck, with their sanders.  Fletcher was already on deck scraping sun damage off the remaining brightwork. Bryan gave new directions for volunteers to focus their sanders on the gaffs and booms that lay on the deck. Anna, without a sander in hand, immediately climbed below into the aft cabin and took charge of cleaning u, and restoring the space to professional order.






The Search for  The Coin

Since Roman times, shipbuilders and sailors would place coins, of any denomination, at the base of their mast, the most recessed lowest bottom part of their boat or ship , where it would remain always, to be used as fare to the Boatman, Charon, for souls lost at sea, enabling safe passage across the river Styx, from the underworld to the Afterlife. 

Sailors, being superstitious, for thousands of years, honored that tradition. It was honored in 1879 when Francis Elizabeth, Spirit of South Carolinas namesake, was built, and again in 22, when Spirit of South Carolina was launched.  We found the coin after lifting her mainmast, an 1879 Silver dollar.  It remains undisturbed awaiting again the stepping her mainmast.  Volunteers gave the coin a short touch for luck, if you believed that, or for some reason more spiritual.. After all, the coin has never been needed. Who would want to break that?